Lokalizácia
Formulár sa odosiela
šiel som mhd a pôjdem domov skorej :) aby som po tretej mohol ísť na moju prvú soušl rajd :P sa naša banka hrozne modernizuje tak to chcem zažiť ten úžasný výkrik moderného pracovného prostredia a potom môžem s kľudom zomrieť :D
Zobraziť komentár 25.10.2022 - 10:16:17
02
Aka je spravna dlzka predstavca😀 https://youtu.be/omE2olOSntM
Zobraziť komentár 25.10.2022 - 11:35:30
00
arrow_leftlapaloma napísal:
šiel som mhd a pôjdem domov skorej :) aby som po tretej mohol ísť na moju prvú soušl rajd :P sa naša banka hrozne modernizuje tak to chcem zažiť ten úžasný výkrik moderného pracovného prostredia a potom môžem s kľudom zomrieť :D

toto je teraz nejaka nova moda ? v nasej banke to pred casom bolo tiez, ze podme sa vsetci spolu pobajkovat. Bohuzial v case, kedy bezny zamestanec (o to viac bezny IT zamestnanec) este zarezava naplno

A temu udrzatelnosti aka sustainability riesite tiez ? Ze ci nase banky nemaju rovnakeho CSR konzultanta ;-)
Zobraziť komentár 25.10.2022 - 12:26:40
00
my mame akurat tak social pivo, nieco taketo inak nehrozi, tu je to samy tlusty iteckar :P
Zobraziť komentár 25.10.2022 - 12:45:09
00
Rano (7:30) na nabrezi pri Lanfranconi sa rozkladali ;) filmari, scena s cielovou branou nejakych cyklistickych pretekov.
(Ani som nestihol porovnat, ci to logo SZC bolo 'skutocne' alebo len podobne)
Zobraziť komentár 25.10.2022 - 20:06:52
00
Vcera ci predvcerom zhanali este detskych cyklistov na akoze preteky. Nepamatam si uz v akej suvislosti to bolo, ale mali natacat propagacne video.
Zobraziť komentár 25.10.2022 - 23:15:20
01
arrow_leftiron.hide napísal:

Týždeň staviaš, 2 hodiny odohráš a asi týždeň rozoberáš :)

Otvoriť v novom okne thumb_up0thumb_down
Zobraziť komentár 26.10.2022 - 23:32:34
15
A pritom koncerty boli cca každé 4 dni cez letnú šnúru. Koľko kompletných pódií majú? Vyzerá to tak, že aj zo 3, ak je pravda, že to tak dlho trvá
Zobraziť komentár 27.10.2022 - 06:57:14
00
Môže byť, že niekoľko. Metallica má takto niekolko kamionov po europe počas turné.
Zobraziť komentár 27.10.2022 - 13:42:17
00
[quote="@1887170"]Týždeň staviaš, 2 hodiny odohráš a asi týždeň rozoberáš :)

Uz som to davnejsie videl, budem v Tn cekovat ci dodrziavaju plan prace :D
Zobraziť komentár 27.10.2022 - 14:37:54
00
arrow_leftjurant napísal:
A pritom koncerty boli cca každé 4 dni cez letnú šnúru. Koľko kompletných pódií majú? Vyzerá to tak, že aj zo 3, ak je pravda, že to tak dlho trvá


Here's to answer your question:

How many elements does the stage consist of, how much does the whole construct weigh and how many stage hands are involved in the construction? The stage consists of thousands of elements and weighs over 300 tons in total. But I never added it all up to know the exact details! Over 100 touring crew members and nearly 150 local volunteers are involved in setting up each show, which is about 250 people per show.

Is it true that the stage was built twice in the end and that it is already being set up in the next city parallel to the show? There are two steel support structures - we call them the "Black Steel" - to which the decorative screens, lights, sound, video and special effects equipment are then attached. Working with two "Black Steel" sets is common for stadium shows that move from city to city. Taking into account the build-up schedule, it is thus possible to play several shows per week, which makes the tour financially viable.

What does this construction schedule look like, how long does it take to set up and dismantle the stage? Three days to build the "Black Steel", one day to install the production (lights/sound/set/video/special effects/backline). After the show, the production technology is loaded in four hours and the "Black Steel" in one day. So a total of four days for assembly and a day and a half for dismantling.

Is set-up and dismantling trained in the run-up to a tour or how is it ensured that the crew can manage it within this time frame during the tour? This is not specifically practiced, but during the rehearsal phase the stage and the stage design are of course set up several times so that the systems can be tested. As the tour progresses, however, the crew keeps finding new ways and optimizing the structure. After a few shows it always goes much faster until the optimum is reached.

And how many trucks are needed to transport the stage? There are 20 trucks for each set of “Black Steel” – that's what we call the steel support structures – and 46 trucks that carry the production equipment.
Zobraziť komentár 27.10.2022 - 16:32:40
01
Takže 2 sady "lešenia" a na to vešajú stále tú istú bižutériu, ktorú majú ráno po koncerte už naloženú a ide na nové miesto
Zobraziť komentár 27.10.2022 - 17:10:54
00
s ohladom na to ze ide o elektroniku je celkom riziko mat len jednu sadu. ale asi maju nejake rezervy a servis na mieste, take kapely urcite nic neriskuju a maju to osefovane
Zobraziť komentár 27.10.2022 - 18:19:00
00
Myslel som to tak, že nemajú dve identické kompletné pódia pripravené na koncert, len dve kostry a jednu sadu na jej ovešanie. Samozrejme kritické diely a všetko potrebné musí byť v zálohe
Zobraziť komentár 27.10.2022 - 18:38:55
00
arrow_leftjurant napísal:
Takže 2 sady "lešenia" a na to vešajú stále tú istú bižutériu, ktorú majú ráno po koncerte už naloženú a ide na nové miesto

To by aj sedelo, lebo tú “bižutériu” nahodia ako poslednú za jeden deň. Boli časi keď im stačilo obaliť mikrofón alobalom a zapáliť, alebo zapáliť seba v ohňovzdornom obleku. Dnes to je už trochu viac profesionálne :)

64.media.tumblr.com

www.nme.com
Zobraziť komentár 27.10.2022 - 23:53:58
01

Výber z produktov

Prejsť do shopu
keyboard_arrow_up